OEE Calculator

Availability × Performance × Quality. Share the result by URL — every input is a query param.

How OEE is calculated

Availability = (Planned − Downtime) / Planned
Performance   = Produced / (Run × Ideal rate/hr / 60)
Quality      = Good / Produced
OEE          = Availability × Performance × Quality

World-class target: 85%. Typical discrete-manufacturing benchmark: 60%. Missing one of the three means the OEE is lower than any one factor.